WL Jeep Forum

Welcome to WLJeepforum.com! Register a free account today to become a member! Once signed in, you'll be able to participate on this site by adding your own topics and posts, as well as connect with other members through your own private inbox!

Just placed an order for '22 GCL Summit Reserve

runningforyou

Well-known member
After checking out the new Wagoneers (ended up being too large for us) we placed an order for a 2022 Grand Cherokee L Summit Reserve with the V8 (WLJT75). Happy to have found this forum. Now let the waiting game commence :)
 

runningforyou

Well-known member
Jeep Chat just confirmed that for my GCL Summit Reserve with the V8: "All of the materials needed to start the build process have been received. The vehicle should be entering the build process shortly." This is progress since Monday (11/15) they were still gathering parts.
 

elsabito

Well-known member
Jeep Chat just confirmed that for my GCL Summit Reserve with the V8: "All of the materials needed to start the build process have been received. The vehicle should be entering the build process shortly." This is progress since Monday (11/15) they were still gathering parts.
Ask your dealer for the current status code in their screen.
The canned message from Jeep makes it look like its in D1.
If that’s the case then they are making good progress being this 2022
 

runningforyou

Well-known member
Ordered 2022 GCL Summit Reserve with the V8 on 11/6.
11/10 had a VIN and Status was D-Firm schedule serial number is assigned
11/15 Jeep Chat said "Your vehicle is in scheduling with parts being gathered. No Dealer ETA yet"
11/20 Jeep Chat said "All of the materials needed to start the build process have been received. The vehicle should be entering the build process shortly. No Dealer ETA yet."
11/30 Jeep Chat said same thing as 11/20
12/1 Update: Jeep Chat said "I can see all the required materials for your vehicle have been gathered and the plant has sequenced your order for production, it should be entering the build anytime now!"
 

elsabito

Well-known member
Ordered 2022 GCL Summit Reserve with the V8 on 11/6.
11/10 had a VIN and Status was D-Firm schedule serial number is assigned
11/15 Jeep Chat said "Your vehicle is in scheduling with parts being gathered. No Dealer ETA yet"
11/20 Jeep Chat said "All of the materials needed to start the build process have been received. The vehicle should be entering the build process shortly. No Dealer ETA yet."
11/30 Jeep Chat said same thing as 11/20
12/1 Update: Jeep Chat said "I can see all the required materials for your vehicle have been gathered and the plant has sequenced your order for production, it should be entering the build anytime now!"
That's an expected message on D1.
Your dealer can tell you the Estimated Ship Date on the system. Jeep chat wouldn't tell you this date, they cannot see it.
 

runningforyou

Well-known member
Ordered 2022 GCL Summit Reserve with the V8 on 11/6.
11/10 had a VIN and Status was D-Firm schedule serial number is assigned
11/15 Jeep Chat said "Your vehicle is in scheduling with parts being gathered. No Dealer ETA yet"
11/20 Jeep Chat said "All of the materials needed to start the build process have been received. The vehicle should be entering the build process shortly. No Dealer ETA yet."
11/30 Jeep Chat said same thing as 11/20
12/1 Update: Jeep Chat said "I can see all the required materials for your vehicle have been gathered and the plant has sequenced your order for production, it should be entering the build anytime now!"
12/2 Update: Dealership emailed today and said "the estimated ship date is 12/07/21"
 

runningforyou

Well-known member
Update
Ordered a 2022 GCL Summit Reserve with the V8 on 11/6
11/10 had a VIN and Status was D-Firm schedule serial number is assigned
11/15 Jeep Chat said "Your vehicle is in scheduling with parts being gathered. No Dealer ETA yet"
11/20 Jeep Chat said "All of the materials needed to start the build process have been received. The vehicle should be entering the build process shortly. No Dealer ETA yet."
11/30 Jeep Chat said same thing as 11/20
12/1 Update: Jeep Chat said "I can see all the required materials for your vehicle have been gathered and the plant has sequenced your order for production, it should be entering the build anytime now!"
12/2 Update: Dealership emailed today and said "the estimated ship date is 12/07/21"
12/6 @ 7:00 AM - Jeep Chat says "Vehicle is currently in the frame stage of the build process."
 

runningforyou

Well-known member
Update
Ordered a 2022 GCL Summit Reserve with the V8 on 11/6
11/10 had a VIN and Status was D-Firm schedule serial number is assigned
11/15 Jeep Chat said "Your vehicle is in scheduling with parts being gathered. No Dealer ETA yet"
11/20 Jeep Chat said "All of the materials needed to start the build process have been received. The vehicle should be entering the build process shortly. No Dealer ETA yet."
11/30 Jeep Chat said same thing as 11/20
12/1 Update: Jeep Chat said "I can see all the required materials for your vehicle have been gathered and the plant has sequenced your order for production, it should be entering the build anytime now!"
12/2 Update: Dealership emailed today and said "the estimated ship date is 12/07/21"
12/6 @ 7:00 AM - Jeep Chat says "Vehicle is currently in the frame stage of the build process."
12/7 @ 7:00 AM - Jeep Chat says "you GCL is in the build stage currently in the paint part of the build."
 

runningforyou

Well-known member
Update
Ordered a 2022 GCL Summit Reserve with the V8 on 11/6
11/10 had a VIN and Status was D-Firm schedule serial number is assigned
11/15 Jeep Chat said "Your vehicle is in scheduling with parts being gathered. No Dealer ETA yet"
11/20 Jeep Chat said "All of the materials needed to start the build process have been received. The vehicle should be entering the build process shortly. No Dealer ETA yet."
11/30 Jeep Chat said same thing as 11/20
12/1 Update: Jeep Chat said "I can see all the required materials for your vehicle have been gathered and the plant has sequenced your order for production, it should be entering the build anytime now!"
12/2 Update: Dealership emailed today and said "the estimated ship date is 12/07/21"
12/6 @ 7:00 AM - Jeep Chat says "Vehicle is currently in the frame stage of the build process."
12/7 @ 7:00 AM - Jeep Chat says "you GCL is in the build stage currently in the paint part of the build."
12/8 @ 7 am - Jeep Chat says "Your vehicle has been built and is pending installation of additional equipment. This is necessary step when additional features or optional equipment packages are added to the vehicle. Currently no Dealer ETA."
 

jn.higgins

New member
Update
Ordered a 2022 GCL Summit Reserve with the V8 on 11/6
11/10 had a VIN and Status was D-Firm schedule serial number is assigned
11/15 Jeep Chat said "Your vehicle is in scheduling with parts being gathered. No Dealer ETA yet"
11/20 Jeep Chat said "All of the materials needed to start the build process have been received. The vehicle should be entering the build process shortly. No Dealer ETA yet."
11/30 Jeep Chat said same thing as 11/20
12/1 Update: Jeep Chat said "I can see all the required materials for your vehicle have been gathered and the plant has sequenced your order for production, it should be entering the build anytime now!"
12/2 Update: Dealership emailed today and said "the estimated ship date is 12/07/21"
12/6 @ 7:00 AM - Jeep Chat says "Vehicle is currently in the frame stage of the build process."
12/7 @ 7:00 AM - Jeep Chat says "you GCL is in the build stage currently in the paint part of the build."
12/8 @ 7 am - Jeep Chat says "Your vehicle has been built and is pending installation of additional equipment. This is necessary step when additional features or optional equipment packages are added to the vehicle. Currently no Dealer ETA."
I ordered my 22 on 10/13 and every time I check in I get the "get fucked don't contact us again" response. I don't know how much longer I can handle this lol
 

Viper15

Active member
I ordered my 22 on 10/13 and every time I check in I get the "get fucked don't contact us again" response. I don't know how much longer I can handle this lol
Welcome to my world !! Ordered SR V8 Aug 9th, mid Oct switched to a '22 ('21 price protected), still no VIN as of a week ago, but do have a VON. We leave for Florida in 2 1/2 weeks for 4 months, and you think you're chomping at the bit. My wife is ready to kick me out. I bet you get yours before I see mine, lol !!!
 

runningforyou

Well-known member
Update
Ordered a 2022 GCL Summit Reserve with the V8 on 11/6
11/10 had a VIN and Status was D-Firm schedule serial number is assigned
11/15 Jeep Chat said "Your vehicle is in scheduling with parts being gathered. No Dealer ETA yet"
11/20 Jeep Chat said "All of the materials needed to start the build process have been received. The vehicle should be entering the build process shortly. No Dealer ETA yet."
11/30 Jeep Chat said same thing as 11/20
12/1 Update: Jeep Chat said "I can see all the required materials for your vehicle have been gathered and the plant has sequenced your order for production, it should be entering the build anytime now!"
12/2 Update: Dealership emailed today and said "the estimated ship date is 12/07/21"
12/6 @ 7:00 AM - Jeep Chat says "Vehicle is currently in the frame stage of the build process."
12/7 @ 7:00 AM - Jeep Chat says "you GCL is in the build stage currently in the paint part of the build."
12/8 @ 7 am - Jeep Chat says "Your vehicle has been built and is pending installation of additional equipment. This is necessary step when additional features or optional equipment packages are added to the vehicle. Currently no Dealer ETA."
12/10 @ 7 am - Jeep Chat said "Your order has been released from the factory and was approved for shipping. Shipping arrangements have not been completed yet but it should be leaving soon!"
 

runningforyou

Well-known member
Update as of this morning - It's shipped with ETA date :)
Ordered a 2022 GCL Summit Reserve with the V8 on 11/6
11/10 had a VIN and Status was D-Firm schedule serial number is assigned
11/15 Jeep Chat said "Your vehicle is in scheduling with parts being gathered. No Dealer ETA yet"
11/20 Jeep Chat said "All of the materials needed to start the build process have been received. The vehicle should be entering the build process shortly. No Dealer ETA yet."
11/30 Jeep Chat said same thing as 11/20
12/1 Update: Jeep Chat said "I can see all the required materials for your vehicle have been gathered and the plant has sequenced your order for production, it should be entering the build anytime now!"
12/2 Update: Dealership emailed today and said "the estimated ship date is 12/07/21"
12/6 @ 7:00 AM - Jeep Chat says "Vehicle is currently in the frame stage of the build process."
12/7 @ 7:00 AM - Jeep Chat says "you GCL is in the build stage currently in the paint part of the build."
12/8 @ 7 am - Jeep Chat says "Your vehicle has been built and is pending installation of additional equipment. This is necessary step when additional features or optional equipment packages are added to the vehicle. Currently no Dealer ETA."
12/10 @ 7 am - Jeep Chat said "Your order has been released from the factory and was approved for shipping. Shipping arrangements have not been completed yet but it should be leaving soon!"
12/14 @ 7 am – Jeep Chat said: “your vehicle is in the shipping stage, in transit to your ordering dealership. Your delivery to dealership ETA window is: 12/23/2021 - 01/04/2022 At this time, we can suggest checking back at the start of your ETA window, for an update on your order, and staying in touch with your ordering dealership.”
 

runningforyou

Well-known member
Checked with dealership today (12/27) and my '22 GCL SR V8 was unloaded from the railcar yesterday 12/26 in Benicia, CA (about 4 hour car right to the north of me). Hopefully they can get it on a truck and shipped to my dealership in the next couple of days. ETA to dealership is now 12/26-1/4.
 

Attachments

  • Jeep.jpg
    Jeep.jpg
    78 KB · Views: 7

runningforyou

Well-known member
Checked with dealership today (12/27) and my '22 GCL SR V8 was unloaded from the railcar yesterday 12/26 in Benicia, CA (about 4 hour car right to the north of me). Hopefully they can get it on a truck and shipped to my dealership in the next couple of days. ETA to dealership is now 12/26-1/4.
Update, as of yesterday afternoon my GCL SR V8 is Shippable again and says "Bay location updated for vehicle shipment". That's sounds like good news.
 

Attachments

  • Screenshot_20211231-220801_Gallery.jpg
    Screenshot_20211231-220801_Gallery.jpg
    613.5 KB · Views: 4

runningforyou

Well-known member
Update (Not received yet) of my order process

Ordered a 2022 GCL Summit Reserve with the V8 on 11/6

11/10: Got VIN and Status was D-Firm schedule serial number is assigned

11/15: Jeep Chat said "Your vehicle is in scheduling with parts being gathered. No Dealer ETA yet"

11/20: Jeep Chat said "All of the materials needed to start the build process have been received. The vehicle should be entering the build process shortly. No Dealer ETA yet."

11/30: Jeep Chat said same thing as 11/20

12/1: Jeep Chat said "I can see all the required materials for your vehicle have been gathered and the plant has sequenced your order for production, it should be entering the build anytime now!"

12/2: Dealership emailed today and said "the estimated ship date is 12/07/21"

12/6: Jeep Chat says "Vehicle is currently in the frame stage of the build process."

12/7: Jeep Chat says "you GCL is in the build stage currently in the paint part of the build."

12/8: Jeep Chat says "Your vehicle has been built and is pending installation of additional equipment. This is necessary step when additional features or optional equipment packages are added to the vehicle. Currently no Dealer ETA."

12/10 Jeep Chat said "Your order has been released from the factory and was approved for shipping. Shipping arrangements have not been completed yet but it should be leaving soon!"

12/14 Jeep Chat said: “your vehicle is in the shipping stage, in transit to your ordering dealership. Your delivery to dealership ETA window is: 12/23/2021 - 01/04/2022

12/22 Dealership: My GCL shows “In Transit” with an ETA of 12/24-1/4

12/26 Dealership: My GCL is on railcar and last check showed passed through Nevada. ETA is 12/26-1/4

12/28 Dealership: My '22 GCL SR V8 was unloaded from the railcar yesterday 12/26 @ 2:19 pm in Benicia, CA (about 4-hour car ride to the north of me). VDC showed “Railcar Unloaded” ETA to dealership is now 12/26-1/4.

12/30 Dealership: My GCL SR V8 was unloaded from the railcar on 12/26 (2:20 pm), but today my order status changed and says “Shippable” = “No”. VDC shows “Ingate/Rebay at Facility” ETA = TBD My dealership said they don't know why it says that?

12/31 Dealership: My GCL SR V8 is Shippable again and VDC says "Bay location updated for vehicle shipment" as of 12/30. ETA = 12/31-1/4

1/3 Dealership: My GCL SR V8 is still at Benicia Railyard. VDC says "Bay location updated for vehicle shipment" as of 12/30. ETA = 1/3-1/17

1/9 Dealership: My GCL SR V8 is still at Benicia Railyard. VDC says "Bay location updated for vehicle shipment" as of 1/5. ETA = 1/9-1/17
 

runningforyou

Well-known member
Update (Not received yet) of my order process

Ordered a 2022 GCL Summit Reserve with the V8 on 11/6

11/10: Got VIN and Status was D-Firm schedule serial number is assigned

11/15: Jeep Chat said "Your vehicle is in scheduling with parts being gathered. No Dealer ETA yet"

11/20: Jeep Chat said "All of the materials needed to start the build process have been received. The vehicle should be entering the build process shortly. No Dealer ETA yet."

11/30: Jeep Chat said same thing as 11/20

12/1: Jeep Chat said "I can see all the required materials for your vehicle have been gathered and the plant has sequenced your order for production, it should be entering the build anytime now!"

12/2: Dealership emailed today and said "the estimated ship date is 12/07/21"

12/6: Jeep Chat says "Vehicle is currently in the frame stage of the build process."

12/7: Jeep Chat says "you GCL is in the build stage currently in the paint part of the build."

12/8: Jeep Chat says "Your vehicle has been built and is pending installation of additional equipment. This is necessary step when additional features or optional equipment packages are added to the vehicle. Currently no Dealer ETA."

12/10 Jeep Chat said "Your order has been released from the factory and was approved for shipping. Shipping arrangements have not been completed yet but it should be leaving soon!"

12/14 Jeep Chat said: “your vehicle is in the shipping stage, in transit to your ordering dealership. Your delivery to dealership ETA window is: 12/23/2021 - 01/04/2022

12/22 Dealership: My GCL shows “In Transit” with an ETA of 12/24-1/4

12/26 Dealership: My GCL is on railcar and last check showed passed through Nevada. ETA is 12/26-1/4

12/28 Dealership: My '22 GCL SR V8 was unloaded from the railcar yesterday 12/26 @ 2:19 pm in Benicia, CA (about 4-hour car ride to the north of me). VDC showed “Railcar Unloaded” ETA to dealership is now 12/26-1/4.

12/30 Dealership: My GCL SR V8 was unloaded from the railcar on 12/26 (2:20 pm), but today my order status changed and says “Shippable” = “No”. VDC shows “Ingate/Rebay at Facility” ETA = TBD My dealership said they don't know why it says that?

12/31 Dealership: My GCL SR V8 is Shippable again and VDC says "Bay location updated for vehicle shipment" as of 12/30. ETA = 12/31-1/4

1/3 Dealership: My GCL SR V8 is still at Benicia Railyard. VDC says "Bay location updated for vehicle shipment" as of 12/30. ETA = 1/3-1/17

1/9 Dealership: My GCL SR V8 is still at Benicia Railyard. VDC says "Bay location updated for vehicle shipment" as of 1/5. ETA = 1/9-1/17
1/12 Dealership just called a few moments ago and said my '22 GCL SR V8 has arrived. They will go through all their inspection stuff tomorrow morning and we can pick up tomorrow afternoon.
 
Top