My build sheet became available on 3-5-22 was told this week ETA to dealer 4-21-22 TO 5-2-22, vehicle was ordered on 12-22-21 (4 months + now) IT IS A 2022 grand cherokee summit reserve 2 row
 

O'Lander22

Well-known member
I ordered a Grand Cherokee L Summit on 1/18 and I noticed that the build sheet was processed today (4/14). Does anyone have a guess how much longer it takes to get to the dealer after the build sheet has been produced?

There is no set answer for this question. It all depends on a lot of things out of our control. They are using the driver and/or truck shortage is causing delays. My Summit which was ordered on 2/21 and had an eta to the dealer of 4/14 now has an eta of 4/19 to 5/2. I did notice that you have the ESLD installed which may have caused a delay in the build process. Mine has the delete as I couldn't even order it at the time.
 
Top